Jack-up Platforms: An Overview


Authors : Heronilda Andaque

Volume/Issue : Volume 8 - 2023, Issue 10 - October

Google Scholar : https://tinyurl.com/2rcfwu4e

Scribd : https://tinyurl.com/yeynwrxv

DOI : https://doi.org/10.5281/zenodo.10020789

Abstract : Jack-up platforms are a type of mobile offshore drilling unit designed to provide stable support for various types of operations in the petroleum industry for the exploration and extraction of hydrocarbons from the seabed. This type of design of jack-up platforms is based on several factors, including water depth, soil conditions, environmental loads, and platform performance requirements. The platform must be designed to withstand the forces of wind, waves, and currents, as well as the weight of the drilling or production equipment. This article provides a summary of the conception, building, installation, operation, and analysis of jack-up structures. It highlights the different types of jack-up platforms, their components, and the various factors that are considered during their design, construction, and installation.

Keywords : Jack up platforms, Design, Operation, Construction, Installation, and Analysis.

Jack-up platforms are a type of mobile offshore drilling unit designed to provide stable support for various types of operations in the petroleum industry for the exploration and extraction of hydrocarbons from the seabed. This type of design of jack-up platforms is based on several factors, including water depth, soil conditions, environmental loads, and platform performance requirements. The platform must be designed to withstand the forces of wind, waves, and currents, as well as the weight of the drilling or production equipment. This article provides a summary of the conception, building, installation, operation, and analysis of jack-up structures. It highlights the different types of jack-up platforms, their components, and the various factors that are considered during their design, construction, and installation.

Keywords : Jack up platforms, Design, Operation, Construction, Installation, and Analysis.

CALL FOR PAPERS


Paper Submission Last Date
31 - May - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe