Abstract :
Subsidized housing in the Papua Highlands is generally not fully adapted to the region's geographical conditions,
climate, and local cultural characteristics. This study aims to analyze the structural components, construction cost,
construction time, and the influence of building volume on the cost and construction time of Honai houses among the Dani,
Lani, and Yali tribes. A mixed-methods approach was employed, involving 75 informants through interviews, field
observations, documentation, and building measurements. Quantitative data were analyzed using SPSS, while qualitative
data were examined descriptively. The findings indicate that all major components of the Honai house are constructed from
locally sourced forest materials, and the construction process is carried out through community mutual cooperation, making
food provision the largest construction expense. Regression analysis revealed that building volume has No. significant effect
on either construction cost (Sig. = 0.154) or construction time (Sig. = 0.347). These findings suggest that Honai construction
is influenced more by the local social system and the availability of natural resources than by building size.
Keywords :
Construction of traditional house: differences in social and cultural values of each tribe
References :
- A. A. Akinsulire, C. Idemudia, A. C. Okwandu, and O. Iwuanyanwu, "Economic and social impact of affordable housing policies: A comparative review," Int. J. Appl. Res. Soc. Sci., vol. 6, no. 7, pp. 1433–1448, Jul. 2024.
- А. F. Safin, R. А. Ibragimov, А. А. Lapidus, and P. P. Oleynik, "Model for determining change of construction duration of large-panel residential buildings," Hous. Constr., no. 10, pp. 28–38, Nov. 2025.
- T. A. Rachman, I. Hendriyani, and R. Pratiwi, "Volume and Cost Analysis in BIM 5D-Based Residential Construction Projects (Case Study of Type 130 3-Storey Residential House Construction Project in Balikpapan City)," J. Talent. Civil, vol. 7, no. 2, p. 860, Aug. 2024.
- R. Respati, R. A. Pratama, N. A. Saputra, and H. P. Jaya, "Analysis of the Influence of Value Engineering on the Scheduling and Cost of Material Warehouse Construction Packages and BPJN KALTARA Equipment Workshops," AGGREGATE, vol. 9, no. 2, pp. 1197–1205, Dec. 2024.
- K. Tochaiwat, N. Pimma, and T. Mantala, "The Effect of the Number of Floors on the Construction of the Houses Built by Conventional System and Precast Technology," Int. J. Build. Urban, Inter. Landsc. Technol., vol. 5, pp. 5–16, Oct. 2015.
- H. Saghi and A. R. Ghaffari, "Studying the effect of modern construction technologies on time, cost, and quality of Iran mass housing projects," J. Civ. Eng. Mater. Appl., vol. 4, no. 4, pp. 233–242, Dec. 2020.
- J. M. Muthike, C. L. Kanali, and A. O. Gwaya, "Effect of Cost of Construction of Medium-Level Building Projects on Project Productivity in Kirinyaga County, Kenya," East African J. Eng., vol. 8, no. 1, pp. 1–16, Jan. 2025.
- M. S. B. A. Abd El-Karim, O. A. Mosa El Nawawy, and A. M. Abdel-Alim, "Identification and assessment of risk factors affecting construction projects," HBRC J., vol. 13, no. 2, pp. 202–216, 2017.
- R. N. Nkado, "Construction time-influencing factors: the contractor's perspective," Constr. Great. Econ., vol. 13, no. 1, pp. 81–89, 1995.
- A. Prasetyo, N. Dita, P. Putra, S. Badawi, I. Nyoman, and D. Putra, "Labor Productivity Disparities in the Planning and Implementation Phases," Potential of J. Civil Polytechnic., vol. 27, no. 2, pp. 39–46, Oct. 2025.
Subsidized housing in the Papua Highlands is generally not fully adapted to the region's geographical conditions,
climate, and local cultural characteristics. This study aims to analyze the structural components, construction cost,
construction time, and the influence of building volume on the cost and construction time of Honai houses among the Dani,
Lani, and Yali tribes. A mixed-methods approach was employed, involving 75 informants through interviews, field
observations, documentation, and building measurements. Quantitative data were analyzed using SPSS, while qualitative
data were examined descriptively. The findings indicate that all major components of the Honai house are constructed from
locally sourced forest materials, and the construction process is carried out through community mutual cooperation, making
food provision the largest construction expense. Regression analysis revealed that building volume has No. significant effect
on either construction cost (Sig. = 0.154) or construction time (Sig. = 0.347). These findings suggest that Honai construction
is influenced more by the local social system and the availability of natural resources than by building size.
Keywords :
Construction of traditional house: differences in social and cultural values of each tribe