Abstract :
The Pue Bongo – I Gusti Ngurah Rai – Padanjakaya intersection is an unsignalized intersection in Palu City,
precisely between the borders of Palupi Village and Pengawu Village, Tatanga District, Palu City, which was previously a
three-way intersection due to the construction of the new Palupi Bridge which was built together with the construction of
the Palu City inner ring road which was included in the post-earthquake reconstruction project so that the intersection
became a four-way intersection. and became very dense with quite high traffic flow, causing increased congestion and
accidents, even to the point of death. This study aims to analyze the performance of the Pue Bongo – I Gusti Ngurah Rai
intersection using PTV Vissim software because this software is a simulation model that can analyze traffic performance
with output results close to field conditions. PTV Vissim is a macrosimulation program used for traffic management. This
program uses computer software to mathematically model the transportation system. To prove that there is no significant
difference between the model output results and the results of observations in the field, calibration and validation are then
carried out. The output results of the Pue Bongo – I Gusti Ngurah Rai intersection model are close to the observation results
with the GEH test results <5 on traffic flow, the calculated t value
Keywords :
Unsignalized Intersection, PTV Vissim, Calibration, Validation, Traffic Performance.
References :
- Clarkson H. Oglesby R. Gary Hicks, 1993 Teknik jalan raya, Edisi Keempat jilid 1, Penerbit Erlangga, Jakarta
- Direktorat Jenderal Bina Marga, 1923. Pedoman kapasitas jalan indonesia (PKJI). No 09/ P /BM/ 2023
- Dirjen Bina Marga, 1990, “Panduan Survai dan Perhitungan Waktu Perjalanan Lalu Lintas”, Departemen Pekerjaan Umum. Jakarta.
- F.D. Hobbs, 1995 Perencanaan dan teknik lalulintas, Edisi ke 2, Penerbit Gajah Mada University Press, Gipps, Yogyakarta.P.G., 1981. A behavioural car-following model for computer simulation. Transportation research part B: methodological, 15(2), pp.105-111.Park, B., & Schneeberger, J. D. (2003). Microscopic simulation model calibration and validation: case study of VISSIM simulation model for a coordinated actuated signal system. Transportation research record, 1856(1), 185-192.Pebriyetti S, Selamet Widodo, Akhmadali,. 1998 Penggunaan software vissim untuk analisa simpang bersinyal. Penerbit Bharata, Jakarta. Putri, Nurjannah H., 2015, “Kalibrasi Vissim untuk Mikrosimulasi Arus Lalu Lintas Tercampur pada SimpangBersinyal pada Simpang Tugu Yogyakarta”, Universitas Gajah Mada. Yogyakarta.Rifqi Firlian Pratama, Faisal Ashar, 2023 Analisis kinerja simpang bersinyal menggunakan software vissim dan PKJI 2014 (Studi kasus : Simpang kandis)Saputra, Fahmi Pratama. 2016 . Analisis dan Optimasi Kinerja Simpang Bersinyal Di Jl. Gunung Bawakaraeng – Jl.Jend.Sudirman Berbasis Micro –Simulasi. Universitas Hasanuddin, Makassar.Sugiyono. (2016). Metode Penelitian Kuantitatif, Kualitatif dan R&D. PT Alfabet. BandungYulianto, B., & Setiono., 2013, “Kalibrasi dan Validasi Mixed Traffic Vissim Model”, Media Teknik Sipil, pp.1-10.
The Pue Bongo – I Gusti Ngurah Rai – Padanjakaya intersection is an unsignalized intersection in Palu City,
precisely between the borders of Palupi Village and Pengawu Village, Tatanga District, Palu City, which was previously a
three-way intersection due to the construction of the new Palupi Bridge which was built together with the construction of
the Palu City inner ring road which was included in the post-earthquake reconstruction project so that the intersection
became a four-way intersection. and became very dense with quite high traffic flow, causing increased congestion and
accidents, even to the point of death. This study aims to analyze the performance of the Pue Bongo – I Gusti Ngurah Rai
intersection using PTV Vissim software because this software is a simulation model that can analyze traffic performance
with output results close to field conditions. PTV Vissim is a macrosimulation program used for traffic management. This
program uses computer software to mathematically model the transportation system. To prove that there is no significant
difference between the model output results and the results of observations in the field, calibration and validation are then
carried out. The output results of the Pue Bongo – I Gusti Ngurah Rai intersection model are close to the observation results
with the GEH test results <5 on traffic flow, the calculated t value
Keywords :
Unsignalized Intersection, PTV Vissim, Calibration, Validation, Traffic Performance.