Authors :
Andi Farah Dinah Kusumawati; Irfan Prasetia
Volume/Issue :
Volume 11 - 2026, Issue 7 - July
Google Scholar :
https://tinyurl.com/45pj2d26
Scribd :
https://tinyurl.com/84r67nxj
DOI :
https://doi.org/10.38124/ijisrt/26jul1796
Note : A published paper may take 4-5
working days from the publication date to appear in PlumX Metrics, Semantic Scholar, and
ResearchGate.
Abstract :
This study discusses the performance of supervisory consultants on the Banjarbaru - Batulicin cross-road
construction project at the PUPR Office of South Kalimantan Province. Implementation obstacles are increasing,
requirements are becoming more extensive, space for movement is increasingly limited, challenges of unavoidable land
conditions, problems of limited funds, time and level of professionalism of implementers, problems of making the available
resources effective, problems of discipline, level of accuracy, and various other problems that are challenges that must be
overcome, accommodated, considered, regulated and secured in its implementation. In contrast to previous research which
is general in nature, this study focuses on supervisory consultants on the Banjarbaru - Batulicin cross-road construction
project at the PUPR Office of South Kalimantan Province with the aim of identifying the most influential factors and
formulating improvement strategies. This research was conducted using the Spearman's rank correlation coefficient, then
continued with the Customer Satisfaction Index (CSI) test to determine the level of satisfaction of the Supervision
Consultant's performance on the Banjarbaru - Batulicin Cross-Road Construction Project, then tested with Importance
Performance Analysis (IPA) to find out which indicators are in the main priority category that need attention because they
show the lowest quadrant. After 3 indicators of supervisory consultant performance satisfaction were tested using the
Customer Satisfaction Index (CSI) and obtained a "Satisfied" result for the 3 indicators, then continued testing with
Importance Performance Analysis (IPA) to obtain 4 variables that entered quadrant A and the main priority of the strategy
to improve the strategy is the variable of work method supervision in construction implementation. The right strategy to
improve the performance of the Supervision Consultant on these variables is a. Periodic control using the weekly schedule
control method, acceleration through the Show Cause Meeting (SCM) mechanism and the application of a seasonal
adaptive schedule.
Keywords :
Supervision Consultant, Highway Project, Performance Expectations, Performance Satisfaction, Improvement Strategy.
References :
- Apriani, L. (2022). Analysis of Budget Efficiency and Its Impact on the Performance of Supervising Consultants on Road Projects in the City of Banjarbaru. Journal of Civil Engineering, Lambung Mangkurat University, 14(2), 45–56.
- Azwar, S. (1986). Reliability and Validity. Yogyakarta: Pustaka Pelajar.
- Ghozali, I. (2009). Applications of Multivariate Analysis using SPSS. Semarang: Diponegoro University Press.
- Kotler, P. (2002). Marketing Management: Analysis, Planning, Implementation, and Control. Jakarta: Erlangga..
- Noor, M. (2020). A Study of Project Owners’ Satisfaction with the Performance of Bridge Supervision Consultants within the Banjarmasin Regional Public Works and Housing Office (BBPJN XI). Master’s Thesis, Lambung Mangkurat University.
- Ramadani, A. (2022). Analysis of the Performance of Road and Bridge Planning Consultants in the Public Works Division of the South Kalimantan Provincial Public Works and Public Housing Department. Journal of Civil Engineering, 18(1), 12–25.
- Riany, S. (2021). Evaluation of the Performance of Supervising Consultants on Water Resources Projects of the Public Works and Public Housing Department of Tapin Regency. Journal of Spatial Construction, 9(3), 110–121.
- Santoso, S. (2011). Marketing Research: Concepts and Applications using SPSS. Jakarta: Elex Media Komputindo.
- Tjiptono, F. (2014). Services Marketing: Principles, Applications and Research. Yogyakarta: Andi Offset.
This study discusses the performance of supervisory consultants on the Banjarbaru - Batulicin cross-road
construction project at the PUPR Office of South Kalimantan Province. Implementation obstacles are increasing,
requirements are becoming more extensive, space for movement is increasingly limited, challenges of unavoidable land
conditions, problems of limited funds, time and level of professionalism of implementers, problems of making the available
resources effective, problems of discipline, level of accuracy, and various other problems that are challenges that must be
overcome, accommodated, considered, regulated and secured in its implementation. In contrast to previous research which
is general in nature, this study focuses on supervisory consultants on the Banjarbaru - Batulicin cross-road construction
project at the PUPR Office of South Kalimantan Province with the aim of identifying the most influential factors and
formulating improvement strategies. This research was conducted using the Spearman's rank correlation coefficient, then
continued with the Customer Satisfaction Index (CSI) test to determine the level of satisfaction of the Supervision
Consultant's performance on the Banjarbaru - Batulicin Cross-Road Construction Project, then tested with Importance
Performance Analysis (IPA) to find out which indicators are in the main priority category that need attention because they
show the lowest quadrant. After 3 indicators of supervisory consultant performance satisfaction were tested using the
Customer Satisfaction Index (CSI) and obtained a "Satisfied" result for the 3 indicators, then continued testing with
Importance Performance Analysis (IPA) to obtain 4 variables that entered quadrant A and the main priority of the strategy
to improve the strategy is the variable of work method supervision in construction implementation. The right strategy to
improve the performance of the Supervision Consultant on these variables is a. Periodic control using the weekly schedule
control method, acceleration through the Show Cause Meeting (SCM) mechanism and the application of a seasonal
adaptive schedule.
Keywords :
Supervision Consultant, Highway Project, Performance Expectations, Performance Satisfaction, Improvement Strategy.