Parking Space Demand Study for Dondo Market, Tojo Una-Una District


Authors : Mohammad Ruslan Mardani; Arief Setiawan; Ratnasari Ramlan

Volume/Issue : Volume 9 - 2024, Issue 8 - August

Google Scholar : https://tinyurl.com/5akmna2w

Scribd : https://tinyurl.com/45z7nx5b

DOI : https://doi.org/10.38124/ijisrt/IJISRT24AUG1538

Abstract : The current parking space at Dondo Market is not effective because it still uses the road shoulder and is not well organised. When the market is busy, the parking area is full of two- and four-wheeled vehicles, spilling over onto the road, causing congestion and disturbing road users. Therefore, an analysis is needed to determine the ideal parking space requirements. The purpose of this study is to provide recommendations for parking space requirements and design its layout, as well as analyse traffic performance on Jl. Tj. Keramat before and after the parking facility. The results show that the market manager should provide potential land for off street parking. There is vacant land to the right and left of the market with a total area of 6,985 m2 which exceeds the current parking demand. If needed, there is still vacant land owned by the community around the market that can be developed as an additional parking area.

Keywords : Parking Space Demand, Dondo Traditional Market, and Traffic Performance.

References :

  1. Abubakar. 1998. Pedoman Perencanaan dan Pengoperasian Fasilitas Parkir. Jakarta:  Direktorat Jenderal Perhubungan Darat.
  2. Direktorat Jenderal Perhubungan Darat. 1996. Pedoman Teknis Penyelenggaraan Fasilitas Parkir. Departemen Perhubungan Republik Indonesia, Jakarta.
  3. Hobbs, F.D. 1995. Perencanaan dan Teknik Lalu Lintas. Yogyakarta: UGM Press.
  4. Munawar Ahmad. 2004. Manajemen Lalu Lintas Perkotaan. Yogyakarta: Penerbit Beta Offset.
  5. Nawawi, Sherly Novita Sari. 2015. Studi Optimalisasi Perparkiran Dan Pedestrian Di Fakultas Teknik Jurusan Sipil Universitas Lampung. JRSDd: Lampung Volume 3 Nomor 1.

The current parking space at Dondo Market is not effective because it still uses the road shoulder and is not well organised. When the market is busy, the parking area is full of two- and four-wheeled vehicles, spilling over onto the road, causing congestion and disturbing road users. Therefore, an analysis is needed to determine the ideal parking space requirements. The purpose of this study is to provide recommendations for parking space requirements and design its layout, as well as analyse traffic performance on Jl. Tj. Keramat before and after the parking facility. The results show that the market manager should provide potential land for off street parking. There is vacant land to the right and left of the market with a total area of 6,985 m2 which exceeds the current parking demand. If needed, there is still vacant land owned by the community around the market that can be developed as an additional parking area.

Keywords : Parking Space Demand, Dondo Traditional Market, and Traffic Performance.

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe