Abstract :
The current parking space at Dondo Market is
not effective because it still uses the road shoulder and is
not well organised. When the market is busy, the parking
area is full of two- and four-wheeled vehicles, spilling over
onto the road, causing congestion and disturbing road
users. Therefore, an analysis is needed to determine the
ideal parking space requirements. The purpose of this
study is to provide recommendations for parking space
requirements and design its layout, as well as analyse
traffic performance on Jl. Tj. Keramat before and after
the parking facility. The results show that the market
manager should provide potential land for off street
parking. There is vacant land to the right and left of the
market with a total area of 6,985 m2 which exceeds the
current parking demand. If needed, there is still vacant
land owned by the community around the market that can
be developed as an additional parking area.
Keywords :
Parking Space Demand, Dondo Traditional Market, and Traffic Performance.
References :
- Abubakar. 1998. Pedoman Perencanaan dan Pengoperasian Fasilitas Parkir. Jakarta: Direktorat Jenderal Perhubungan Darat.
- Direktorat Jenderal Perhubungan Darat. 1996. Pedoman Teknis Penyelenggaraan Fasilitas Parkir. Departemen Perhubungan Republik Indonesia, Jakarta.
- Hobbs, F.D. 1995. Perencanaan dan Teknik Lalu Lintas. Yogyakarta: UGM Press.
- Munawar Ahmad. 2004. Manajemen Lalu Lintas Perkotaan. Yogyakarta: Penerbit Beta Offset.
- Nawawi, Sherly Novita Sari. 2015. Studi Optimalisasi Perparkiran Dan Pedestrian Di Fakultas Teknik Jurusan Sipil Universitas Lampung. JRSDd: Lampung Volume 3 Nomor 1.
The current parking space at Dondo Market is
not effective because it still uses the road shoulder and is
not well organised. When the market is busy, the parking
area is full of two- and four-wheeled vehicles, spilling over
onto the road, causing congestion and disturbing road
users. Therefore, an analysis is needed to determine the
ideal parking space requirements. The purpose of this
study is to provide recommendations for parking space
requirements and design its layout, as well as analyse
traffic performance on Jl. Tj. Keramat before and after
the parking facility. The results show that the market
manager should provide potential land for off street
parking. There is vacant land to the right and left of the
market with a total area of 6,985 m2 which exceeds the
current parking demand. If needed, there is still vacant
land owned by the community around the market that can
be developed as an additional parking area.
Keywords :
Parking Space Demand, Dondo Traditional Market, and Traffic Performance.