Abstract :
PT. Fajar Surya Wisesa specializes in
manufacturing packaging paper, with its factory located
in the WWTP Department. The company is dedicated to
enhancing the productivity and operational efficiency of
its Centrifugal Pump machines through effective
maintenance strategies. This study employs a
quantitative approach to assess the Overall Equipment
Effectiveness (OEE), encompassing availability,
performance efficiency, and quality rate, alongside a Six
Big Losses analysis. The findings revealed that the
average machine availability reached 98%, with a
notable decrease observed in August due to downtime
incidents. Performance efficiency consistently exceeded
90%, although higher production outputs occasionally
led to efficiency declines. Quality rates remained stable
and high, signaling advancements in production
processes and quality control measures. Overall, the
average OEE value attained 88%, surpassing the global
standard of 85%. To further optimize Centrifugal Pump
machine effectiveness, proposed enhancements include
operator training, regular performance assessments,
improved operator welfare considerations, selection of
premium raw materials, updates to standard operating
procedures (SOPs), scheduled preventive maintenance,
enhanced workplace safety measures, and investments in
energy backup systems. In conclusion, these initiatives
have effectively elevated the performance and
operational quality of the Centrifugal Pump machines at
PT. Fajar Surya Wisesa.
Keywords :
Centrifugal Pump Machine, Overall Equipment Effectiveness (OEE), Total Productive Maintenance (TPM).
References :
- A. G. Ramadhani, D. Z. Azizah, F. Nugraha, and M. Fauzi, "Analysis of the Application of Tpm (Total Productive Maintenance) and OEE (Overall Equipment Effectiveness) on Auto Cutting Machines in Pt XYZ," J. Ilm. Tech. and Manaj. Ind., vol. 2, no. 1, pp. 59–69, 2022, doi: 10.46306/tgc.v2i1.25.
- M. A. Pratama, F. A. Kurniawan, and A. Irwan, "Analysis of the Implementation of Total Productive Maintenance (TPM) through the Overall Equipment Effectiveness (OEE) Method on Packer Machines at Pt. XYZ Cement Plant," JiTEKH, vol. 8, no. 1, pp. 11–21, 2020, doi: 10.35447/jitekh.v8i1.305.
- Hadi Ariyah, "Application of the Overall Equipment Effectiveness (OEE) Method in Improving the Efficiency of Batching Plant Machines (Case Study: PT. Lutvindo Wijaya Perkasa)" J. Technol. and Manaj. Ind. Terap., vol. 1, no. 2, pp. 70–77, 2022, doi: 10.55826/tmit.v1iii.10.
- D. Saputra, "How to Calculate Overall Equipment Effectiveness (OEE)," SCM Guid., 2022, [Online]. Available: https://scmguide.com/id/cara-menghitung-overall-equipment-effectiveness-oee/#google_vignette
- M. Nur and H. Haris, "Proposed Improvements for Machine Effectiveness Through Analysis of TPM Implementation Using OEE and Six Big Losses Methods at PT. P&P Bangkinang," 2019.
- B. Setiawan, F. Al Latif, and E. Rimawan, "Overall Equipment Effectiveness (OEE) Analysis: A Case Study in the PVC Compound Industry," IJIEM - Indones. J. Ind. Eng. Manag., Vol. 3, No. 1, p. 14, 2022, doi: 10.22441/ijiem.v3i1.12066.
- R. A. Kameiswara, A. B. Sulistiyo, and Wawan Gunawan, "Analysis of Overall Equipment Effectiveness (OEE) in Reducing Six Big Losses in Cooling Pump Blower Plant PT. Integrated Steel Plant," J. InTent, vol. 1, no. 1, pp. 67–78, 2018.
- R. A. Jamil and Muhammad Zakinura, "Calculation of Overall Equipment Effectiveness Value on Kubota Double Suction Volute Pump Model Dv-L Distribution Pump at Pt. Abc," J. Permadi Design, Manufacturing, Mater. and Energy, vol. 2, no. 3, pp. 87–101, 2020, doi: 10.52005/permadi.v2i3.38.
- F. I. Aryanti, T. B. Santoso, F. P. Christian, and D. A. Putra, "The Application of Total Productive Maintenance (TPM) in the Implementation of Overall Equipment Effectiveness (OEE) in PT. XYZ," J. Service. Masy. and sustainability, vol. 1, p. 1, 2023, doi: https://doi.org/10.52330/jocss.v1i1.135.
- M. S. Taufiq and E. W. Abryandoko, "Implementation of Total Productive Maintenance with the Overall Equipment Efficacy (OEE) Method in Ngagel III Distribution Pumps," Konf. Nas. Researcher. and Service. 3rd Univ. Buana Perjuangan KarawangPp. 240–253, 2023.
PT. Fajar Surya Wisesa specializes in
manufacturing packaging paper, with its factory located
in the WWTP Department. The company is dedicated to
enhancing the productivity and operational efficiency of
its Centrifugal Pump machines through effective
maintenance strategies. This study employs a
quantitative approach to assess the Overall Equipment
Effectiveness (OEE), encompassing availability,
performance efficiency, and quality rate, alongside a Six
Big Losses analysis. The findings revealed that the
average machine availability reached 98%, with a
notable decrease observed in August due to downtime
incidents. Performance efficiency consistently exceeded
90%, although higher production outputs occasionally
led to efficiency declines. Quality rates remained stable
and high, signaling advancements in production
processes and quality control measures. Overall, the
average OEE value attained 88%, surpassing the global
standard of 85%. To further optimize Centrifugal Pump
machine effectiveness, proposed enhancements include
operator training, regular performance assessments,
improved operator welfare considerations, selection of
premium raw materials, updates to standard operating
procedures (SOPs), scheduled preventive maintenance,
enhanced workplace safety measures, and investments in
energy backup systems. In conclusion, these initiatives
have effectively elevated the performance and
operational quality of the Centrifugal Pump machines at
PT. Fajar Surya Wisesa.
Keywords :