Abstract : The design of traffic lights at an intersection is an alternative form of solution to the problems that occur on roads in urban areas. In particular, the intersection of Jalan Sultan Adam Banjarmasin is one of the intersections that uses alternative control of the problem. The dominant problem at this intersection is the large amount of traffic flow that occurs during peak hours. These problems cause opportunities for traffic accidents, both serious and minor accidents. To evaluate the traffic lights at this four-way intersection, data such as road geometric conditions and traffic flow volumes are required, which are the basic data supporting traffic evaluation. Data processing procedures include determining the phase of the intersection, the calculation of signal time, cycle time, road capacity, and degree of saturation. all of which are the core of this traffic light evaluation calculation, where the calculation for 1 cycle time that is feasible in MKJI is 130 seconds using the calculation of 4 (four) phases based on the Webster method, until the calculation of existing conditions on the Jalan SPBU C = 724. 50 pcu/hour and DS = 1.35 pcu/hour, Jalan Sungai Andai C = 207.66 pcu/hour and DS = 2.62 pcu/hour, Jalan Benua Anyar C = 341.95 pcu/hour and DS = 2.38 pcu/hour, Jalan Sultan Adam C = 256.05 pcu/hour and DS = 1.98 pcu/hour. Also obtained is the calculation of setting conditions on Jalan SPBU C = 1220.97 pcu/hour and DS = 0.80 pcu/hour, Jalan Sungai Andai C = 684.74 pcu/hour and DS = 0.80 pcu/hour, Jalan Benua Anyar C = 1018.58 pcu/hour and DS = 0.80 pcu/hour, Jalan Sultan Adam C = 632. 31 pcu/hour and DS = 0.80 pcu/hour.

Keywords : Signalized Intersection; Traffic Light; Road Capacity; Saturation Degree.

The design of traffic lights at an intersection is an alternative form of solution to the problems that occur on roads in urban areas. In particular, the intersection of Jalan Sultan Adam Banjarmasin is one of the intersections that uses alternative control of the problem. The dominant problem at this intersection is the large amount of traffic flow that occurs during peak hours. These problems cause opportunities for traffic accidents, both serious and minor accidents. To evaluate the traffic lights at this four-way intersection, data such as road geometric conditions and traffic flow volumes are required, which are the basic data supporting traffic evaluation. Data processing procedures include determining the phase of the intersection, the calculation of signal time, cycle time, road capacity, and degree of saturation. all of which are the core of this traffic light evaluation calculation, where the calculation for 1 cycle time that is feasible in MKJI is 130 seconds using the calculation of 4 (four) phases based on the Webster method, until the calculation of existing conditions on the Jalan SPBU C = 724. 50 pcu/hour and DS = 1.35 pcu/hour, Jalan Sungai Andai C = 207.66 pcu/hour and DS = 2.62 pcu/hour, Jalan Benua Anyar C = 341.95 pcu/hour and DS = 2.38 pcu/hour, Jalan Sultan Adam C = 256.05 pcu/hour and DS = 1.98 pcu/hour. Also obtained is the calculation of setting conditions on Jalan SPBU C = 1220.97 pcu/hour and DS = 0.80 pcu/hour, Jalan Sungai Andai C = 684.74 pcu/hour and DS = 0.80 pcu/hour, Jalan Benua Anyar C = 1018.58 pcu/hour and DS = 0.80 pcu/hour, Jalan Sultan Adam C = 632. 31 pcu/hour and DS = 0.80 pcu/hour.

Keywords : Signalized Intersection; Traffic Light; Road Capacity; Saturation Degree.

CALL FOR PAPERS


Paper Submission Last Date
31 - May - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe