Enhancing Labor Productivity in the Construction Industry: Strategies and Techniques


Authors : Saurav Rathor; Ajay Kumar Singh; Ayush Sangal

Volume/Issue : Volume 9 - 2024, Issue 9 - September


Google Scholar : https://tinyurl.com/59hv69pn

DOI : https://doi.org/10.38124/ijisrt/24sep1544

Note : A published paper may take 4-5 working days from the publication date to appear in PlumX Metrics, Semantic Scholar, and ResearchGate.


Abstract : The construction industry faces significant labor productivity challenges, impacting project timelines, costs, and quality. This study investigates strategies and techniques to improve labor productivity in the construction industry, focusing on technological advancements, workforce management, and process optimization. The construction business is widely acknowledged as the largest and most challenging sector on a worldwide scale. Maximizing efficiency in this sector is highly dependent on the strategic administration of personnel. Efficient deployment of human resources can greatly enhance productivity growth. Construction projects primarily depend on human labor and the fundamental utilization of handheld tools and equipment, with labor expenses constituting around 30% to 50% of the whole project expenditure. In this study, the factors affecting the labour productivity in construction industry was analyzed. The study distribute 550 questionnaires to employees working in a construction company. Overall, 478 questionnaires were received and retained for analysis. Findings reveals a complex interplay of internal, external, communication, resource, and miscellaneous challenges that significantly influence project outcomes.

Keywords : Labour Productivity, Construction, Human Resources, Internal Factors, External Factors.

References :

  1. Maloney, W. F. (1983). Productivity improvement: The influence of labor. Journal of Construction  Engineering and Management, 109(3),      321–334. https://doi.org/10.1061/(ASCE)0733-9364(1983)109:3(321)
  2. Olomolaiye, P. O., Wahab, K., & Price, A. D. (1987). Problems influencing craftsmen’s productivity in Nigeria. Building and Environment, 22(4), 317–323. https://doi.org/10.1016/0360-1323(87)90024-2
  3. Horner, R., Talhouni, B., & Thomas, H. (1989). Preliminary results of major labour productivity monitoring pro- gramme. Proceedings of the 3rd Yugoslavian Symposium on Construction Management (pp. 18–28).
  4. Lim, E. C., & Alum, J. (1995). Construction productivity: Issues encountered by contractors in Singapore. International Journal of Project Management, 13(1), 51–58. https://doi.org/10.1016/0263-7863(95)95704-H
  5. Lim, E. C., & Alum, J. (1995). Construction productivity: Issues encountered by contractors in Singapore. International Journal of Project Management, 13(1), 51–58. https://doi.org/10.1016/0263-7863(95)95704-H
  6. Zakeri, M., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1996). A survey of constraints on Iranian construc- tion operatives’ productivity. Construction Management & Economics, 14(5), 417–426. https://doi.org/10.1080/014461996373287
  7. Zakeri, M., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1996). A survey of constraints on Iranian construc- tion operatives’ productivity. Construction Management & Economics, 14(5), 417–426. https://doi.org/10.1080/014461996373287
  8. Zakeri, M., Olomolaiye, P., Holt, G., & Harris, F. (1997). Factors affecting the motivation of Iranian con- struction operatives. Building and Environment, 32(2), 161–166. https://doi.org/10.1016/S0360-1323(96)00044-3
  9. Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing craftsmen’s productivity in Indonesia. International Journal of Project Management, 15(1), 21–30. https://doi.org/10.1016/S0263-7863(96)00019-1
  10. Zakeri, M., Olomolaiye, P., Holt, G., & Harris, F. (1997). Factors affecting the motivation of Iranian construction operatives. Building and Environment, 32(2), 161–166. https://doi.org/10.1016/S0360-1323(96)00044-3
  11. Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing craftsmen’s productivity in Indonesia. International Journal of Project Management, 15(1), 21–30. https://doi.org/10.1016/S0263-7863(96)00019-1
  12. Chitkara, K. (1998). Construction project management. Tata McGraw-Hill Education.
  13. Mustapha, F., &Naoum, S. (1998). Factors influencing the effectiveness of construction site managers.International Journal of Project Management, 16(1), 1–8. https://doi.org/10.1016/S0263-7863(97)00025-2
  14. Mustapha, F., &Naoum, S. (1998). Factors influencing the effectiveness of construction site managers. International Journal of Project Management, 16(1), 1–8. https://doi.org/10.1016/S0263-7863(97)00025-2
  15. Wilcox, S., Stringfellow, B., Harris, R., & Martin, B. (2000). Management and productivity. Transportation research board, committee on management and productivity.
  16. Arditi, D., &Mochtar, K. (2000). Trends in productivity improvement in the US construction industry. Construction Management & Economics, 18(1), 15–27. https://doi.org/10.1080/014461900370915
  17. Arditi, D., &Mochtar, K. (2000). Trends in productivity improvement in the US construction industry.Construction        Management & Economics, 18(1), 15–27. https://doi.org/10.1080/014461900370915
  18. Mctague, B., &Jergeas, G. (2002). Productivity improvements on Alberta major construction projects: Phase I-Back to basics. Alberta economic development.
  19. Hanna, A. S., Peterson, P., & Lee, M.-J. (2002). Benchmarking productivity indicators for electrical/mechanical pro- jects. Journal of Construction Engineering and Management, 128(4), 331–337. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(331)
  20. Liberda, M., Ruwanpura, J., &Jergeas, G. (2003). Construction productivity improvement: A study of human, management and external issues. Construction Research Congress: Wind of Change: Integration and Innovation.
  21. Srinavin, K., & Mohamed, S. (2003). Thermal environment and construction workers’ productivity: Some evidence from Thailand. Building and Environment, 38(2), 339– 345. https://doi.org/10.1016/S0360-1323(02)00067-7
  22. Ng, S. T., Skitmore, R. M., Lam, K. C., & Poon, A. W. (2004). Demotivating factors influencing the productivity of civil engineering projects. International Journal of Project Management, 22(2), 139–146. https://doi.org/10.1016/S0263-7863(03)00061-9
  23. Tam, C., Zeng, S., & Deng, Z. (2004). Identifying elements of poor construction safety management in China. Safety Science, 42(7), 569–586. https://doi.org/10.1016/j.ssci.2003.09.001
  24. Kadir, M. A., Lee, W., Jaafar, M., Sapuan, S., & Ali, A. (2005). Factors affecting construction labourproduc- tivity for Malaysian residential projects. Structural survey.
  25. Coelli, T. J., Rao, D. S. P., O’donnell, C. J., &Battese, G. E. (2005). An introduction to efficiency and productivity analysis. Springer Science & Business Media.

The construction industry faces significant labor productivity challenges, impacting project timelines, costs, and quality. This study investigates strategies and techniques to improve labor productivity in the construction industry, focusing on technological advancements, workforce management, and process optimization. The construction business is widely acknowledged as the largest and most challenging sector on a worldwide scale. Maximizing efficiency in this sector is highly dependent on the strategic administration of personnel. Efficient deployment of human resources can greatly enhance productivity growth. Construction projects primarily depend on human labor and the fundamental utilization of handheld tools and equipment, with labor expenses constituting around 30% to 50% of the whole project expenditure. In this study, the factors affecting the labour productivity in construction industry was analyzed. The study distribute 550 questionnaires to employees working in a construction company. Overall, 478 questionnaires were received and retained for analysis. Findings reveals a complex interplay of internal, external, communication, resource, and miscellaneous challenges that significantly influence project outcomes.

Keywords : Labour Productivity, Construction, Human Resources, Internal Factors, External Factors.

CALL FOR PAPERS


Paper Submission Last Date
30 - June - 2025

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe