Abstract :
The prospectus needs to generate energy by
the development of an offshore wind machine and the
subsequent utilization of the energy is a key issue.
Meteorological data was obtained and analyzed for two
states in the Niger-Delta region of Nigeria. Theoretical
analysis confirmed that the average wind speeds
produced are sufficient enough for the generation of
offshore wind energy. 25meter diameter (which can be
more) of offshore wind turbine was used at different
depth and distance from shore. Offshore wind speed
data for eleven years (1993 - 2003) were sourced from
meteorological center Mushin. The results showed that
wind power output of 106. 22kw (25m diameter wind
turbine) may be a reality for only a state
Keywords :
Prospect, Development, utilization. Offshore, Turbine, Energy.
The prospectus needs to generate energy by
the development of an offshore wind machine and the
subsequent utilization of the energy is a key issue.
Meteorological data was obtained and analyzed for two
states in the Niger-Delta region of Nigeria. Theoretical
analysis confirmed that the average wind speeds
produced are sufficient enough for the generation of
offshore wind energy. 25meter diameter (which can be
more) of offshore wind turbine was used at different
depth and distance from shore. Offshore wind speed
data for eleven years (1993 - 2003) were sourced from
meteorological center Mushin. The results showed that
wind power output of 106. 22kw (25m diameter wind
turbine) may be a reality for only a state
Keywords :
Prospect, Development, utilization. Offshore, Turbine, Energy.