Abstract :
Hydropower station development is mainly
based on the reservoir type and its available head.
Therefore, this paper was written on basis of how to
design a 15MW Hydropower Station considering
environmental factors, civil concerns and
electromechanical integrations. This paper discuss the
most important design arguments under construction of
the specific 15MW small hydropower station structure
and its mathematical modellings. It was used
MatLab/Simulink, SolidWorks, and ANSYS software
tools to observe its simulation results. The hydropower
system will be changing its generation as the load
requirement deviates and the author contributed the
load response power generating system design in this
paper.
Keywords :
Hydropower, Civil Structure, Electromechanical, PID Governor control, Excitation.
Hydropower station development is mainly
based on the reservoir type and its available head.
Therefore, this paper was written on basis of how to
design a 15MW Hydropower Station considering
environmental factors, civil concerns and
electromechanical integrations. This paper discuss the
most important design arguments under construction of
the specific 15MW small hydropower station structure
and its mathematical modellings. It was used
MatLab/Simulink, SolidWorks, and ANSYS software
tools to observe its simulation results. The hydropower
system will be changing its generation as the load
requirement deviates and the author contributed the
load response power generating system design in this
paper.
Keywords :
Hydropower, Civil Structure, Electromechanical, PID Governor control, Excitation.