Abstract : The prime objective of conducting this study was the design of a multistorey (G+2) building. Two different design methodologies were used for the design of this building and the quantities of concrete and steel obtained using both these approaches were compared. Limit State method is based on the concepts of serviceability and thus renders reduced sections of members. The study assess the amount of reduction in the quantity of steel as well as concrete when limit state philosophy is used over the working stress philosophy which is based on the safety criteria.

Keywords : Multisory; Design; Limit State; Working Stress.

The prime objective of conducting this study was the design of a multistorey (G+2) building. Two different design methodologies were used for the design of this building and the quantities of concrete and steel obtained using both these approaches were compared. Limit State method is based on the concepts of serviceability and thus renders reduced sections of members. The study assess the amount of reduction in the quantity of steel as well as concrete when limit state philosophy is used over the working stress philosophy which is based on the safety criteria.

Keywords : Multisory; Design; Limit State; Working Stress.

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe