Cost Control Practices and Project Performance in Public Construction Projects in Kigali City: Evidence from the Kigali Infrastructure Project


Authors : Djafari Gihozo

Volume/Issue : Volume 11 - 2026, Issue 10 - October


Google Scholar : https://tinyurl.com/ms6s6a36

DOI : https://doi.org/10.38124/ijisrt/26Oct216

Note : A published paper may take 4-5 working days from the publication date to appear in PlumX Metrics, Semantic Scholar, and ResearchGate.


Abstract : Public construction projects in developing economies frequently suffer from cost overruns and delays due to fragmented financial governance and weak resource control. This study investigated the effect of cost control practices — cash flow monitoring, cost budgeting, cost estimation, and procurement planning — on project performance in the Kigali Infrastructure Project (KIP).

Keywords : Cost Control Practices; Cash Flow Monitoring; Cost Budgeting; Cost Estimation; Procurement Planning; Project Performance; Rwanda.

References :

  1. M. C. Jensen and W. H. Meckling, “Theory of the firm: Managerial behavior, agency costs and ownership structure,” Journal of Financial Economics, vol. 3, no. 4, pp. 305-360, 1976. https://doi.org/10.1016/0304-405X(76)90026-X
  2. K. M. Eisenhardt, “Agency theory: An assessment and review,” Academy of Management Review, vol. 14, no. 1, pp. 57-74, 1989. https://doi.org/10.2307/258191
  3. O. E. Williamson, The Economic Institutions of Capitalism: Firms, Markets, Relational Contracting. New York: Free Press, 1985.
  4. A. Hassan and S. Mahmoud, “Cash flow monitoring and construction project performance in Egypt,” Journal of Construction Management and Economics, vol. 42, no. 2, pp. 115-130, 2024.
  5. F. Alharbi and M. Alotaibi, “Cost budgeting and infrastructure project performance in Saudi Arabia,” Journal of Construction Management, vol. 42, no. 1, pp. 55-70, 2024.
  6. D. D. Ahiaga-Dagbui and P. E. D. Love, “Revisiting the causes of cost overruns in construction projects: The role of initial cost estimation and optimism bias,” Construction Management and Economics, vol. 40, no. 3-4, pp. 245-260, 2022.
  7. B. Flyvbjerg, M. K. Holm, and S. L. Buhl, “Underestimating costs in public works projects: Error or lie?,” Journal of Transport Economics and Policy, vol. 56, no. 1, pp. 1-25, 2022.
  8. J. N. Agumba and T. C. Haupt, “Public procurement planning and its influence on construction project performance in Sub-Saharan Africa,” Journal of Public Procurement, vol. 22, no. 3, pp. 215-232, 2022.
  9. O. Baributsa and G. Njenga, “Influence of project cost control on construction project performance in Rwanda,” Strategic Journal of Business & Change Management, vol. 10, no. 4, pp. 902-915, 2023.
  10. C. Byiringiro, “Analysis of cost and time overruns in Kigali road construction projects,” Rwanda University Repository, 2021.
  11. A. Field, Discovering Statistics Using IBM SPSS Statistics, 6th ed. London: SAGE Publications, 2022.
  12. T. D. Akinosho and S. Ojo, “The impact of cash flow monitoring on the financial performance of public construction projects in Sub-Saharan Africa,” Journal of Financial Management in Construction, vol. 15, no. 1, pp. 45-58, 2022.
  13. O. Akinradewo and C. Aigbavboa, “Pre-construction cost estimation accuracy and its impact on public infrastructure project performance in Sub-Saharan Africa,” Journal of Engineering, Design and Technology, vol. 21, no. 2, pp. 315-332, 2023.
  14. M. Gamil and A. Al-Aghbari, “The impact of cost planning and budgeting on the success of construction projects in developing countries,” Journal of Engineering, Design and Technology, vol. 20, no. 4, pp. 890-908, 2022.
  15. P. E. D. Love and D. D. Ahiaga-Dagbui, “The fallacy of competition in construction procurement and cost estimation,” International Journal of Project Management, vol. 40, no. 4, pp. 412-425, 2022.
  16. F. S. Amanya and G. Njenga, “Construction delays and cost overruns in Rwanda: A case of Kigali projects,” Journal of Entrepreneurship and Project Management, vol. 6, no. 1, pp. 34-52, 2022.
  17. C. R. Kothari and G. Gaurav, Research Methodology: Methods and Techniques, 5th ed. New Delhi: New Age International Publishers, 2022.
  18. B. Flyvbjerg, “Top ten behavioral biases in project management: An overview,” Project Management Journal, vol. 52, no. 6, pp. 531-546, 2021.

Public construction projects in developing economies frequently suffer from cost overruns and delays due to fragmented financial governance and weak resource control. This study investigated the effect of cost control practices — cash flow monitoring, cost budgeting, cost estimation, and procurement planning — on project performance in the Kigali Infrastructure Project (KIP).

Keywords : Cost Control Practices; Cash Flow Monitoring; Cost Budgeting; Cost Estimation; Procurement Planning; Project Performance; Rwanda.

Paper Submission Last Date
31 - October - 2026

SUBMIT YOUR PAPER CALL FOR PAPERS
Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe