Cost and Time Optimization of Highway (NH 24-B, Phase-I) Construction


Authors : Lalitesh Sinha, Atul Tripathi.

Volume/Issue : Volume 4 - 2019, Issue 7 - July

Google Scholar : https://goo.gl/DF9R4u

Scribd : https://bit.ly/2JK5E69

India is a growing country, and its progress mainly depends on the economy, Infrastructure and the living standards of the public in the country. India’s infrastructure facilities including transport, electricity and sanitation are still estimated inadequate for its population and thereby presenting a challenge for sustainable progress. For completing a highway project in transportation with minimum time and cost is critical in a competitive situation. Time and cost are the main objective to be discussed in the present optimization study using Genetic Algorithm (GA) for highway project. For scheduling of project has been used which gives the correct and accurate schedule of the project while GA optimization solver in MATLAB are used to optimize time and cost of the project. The Performance of the solvers mainly depends upon the parameters of GA which are used according to target and actual duration of project.

Keywords : Time, Cost, Optimization and Genetic Algorithm.

CALL FOR PAPERS


Paper Submission Last Date
30 - April - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe