Abstract :
Proper and planned construction
management in managing time and costs which is a
benchmark in the success of a project. A construction
project, in its implementation, often finds a condition
where optimization must be carried out precisely and
quickly in meeting the time demands of a contract which
reflects the wishes of an owner as a provider of funds.
Therefore, it is necessary to use the Time and Cost
Prediction Application for Construction Projects to be
able to estimate the time and costs required so that the
project can be completed on time. One method that can
be used is the POM-QM Based Linear Programming
method. This research is focused on knowing:
1Optimization of project completion costs;
2Optimization of project completion time; 3Opportunity
or probability of project completion time. The data used
is from the Aspena Residence-Tangerang Apartment
Project, in terms of architectural work from the 5th
floor to the 11th floor.From this research, the researcher hopes that
this research can be useful for related parties as
material for consideration in planning and evaluating
project completion time, as well as for other new
projects.
Keywords :
Cost and Time Optimization; POM-QM;
Proper and planned construction
management in managing time and costs which is a
benchmark in the success of a project. A construction
project, in its implementation, often finds a condition
where optimization must be carried out precisely and
quickly in meeting the time demands of a contract which
reflects the wishes of an owner as a provider of funds.
Therefore, it is necessary to use the Time and Cost
Prediction Application for Construction Projects to be
able to estimate the time and costs required so that the
project can be completed on time. One method that can
be used is the POM-QM Based Linear Programming
method. This research is focused on knowing:
1Optimization of project completion costs;
2Optimization of project completion time; 3Opportunity
or probability of project completion time. The data used
is from the Aspena Residence-Tangerang Apartment
Project, in terms of architectural work from the 5th
floor to the 11th floor.From this research, the researcher hopes that
this research can be useful for related parties as
material for consideration in planning and evaluating
project completion time, as well as for other new
projects.