Causes of Variation Order and the Impact on Project Cost Building in Sudirman


Authors : Caesarani Gloria Putri; Erry Rimawan; Lindra Aulia Rachman; Prasetyo Madyo Utomo

Volume/Issue : Volume 5 - 2020, Issue 7 - July

Google Scholar : http://bitly.ws/9nMw

Scribd : https://bit.ly/2WT4g8U

DOI : 10.38124/IJISRT20JUL215

Abstract : Variation order on the construction project can negatively affect project implementation costs are swelling. This occurs due to the factors that cause variation work order. Data collection technique used observation and interview methods and then be made a factor analysis of causes and effects of variation order to the cost of implementation. These results indicate that the biggest factors causing variation work order is a design change with a percentage of 60%, while the smallest is the causative factor prime cost rate with the percentage of 2% of the total number of jobs variation order. The impact on costs due to the variation of work orders amounted to 4.78% of the amount of the initial contract with the percentage of 34.85% work structures and architectural work for 65.15% of the total variation work order.

Keywords : Variation order, construction, contract, cost, etc.

Variation order on the construction project can negatively affect project implementation costs are swelling. This occurs due to the factors that cause variation work order. Data collection technique used observation and interview methods and then be made a factor analysis of causes and effects of variation order to the cost of implementation. These results indicate that the biggest factors causing variation work order is a design change with a percentage of 60%, while the smallest is the causative factor prime cost rate with the percentage of 2% of the total number of jobs variation order. The impact on costs due to the variation of work orders amounted to 4.78% of the amount of the initial contract with the percentage of 34.85% work structures and architectural work for 65.15% of the total variation work order.

Keywords : Variation order, construction, contract, cost, etc.

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe