Assessment of Selected Pre-Qualification Exercise in Lagos State


Authors : OLADIGBOLU Edward; OYENUGA Ayomide; AJAYI Daniel; GEORGE Joy-Berachah; AREWA Dickon; NDON David; SEGUN-OSIFESO Temitope; IMAFIDON Elvis

Volume/Issue : Volume 7 - 2022, Issue 8 - August


Google Scholar : https://bit.ly/3IIfn9N

Scribd : https://bit.ly/3CQbj7X


Abstract : One of the most crucial choices a client can make for the progress of the project is the choice of a qualified contractor for a building project. Prequalification is a process to assess and evaluate a contractor's competence and skills to effectively finish a project if it is assigned to them. The purpose of this study is to evaluate a few prequalification processes in Lagos State. In this research project, survey research was used. A thorough study of the available literature was done, along with a well-designed questionnaire. A questionnaire that was sent to clients and contractors (Architects, Builders, Engineers and Quantity Surveyors) was used to gather the data. A statistical table, frequency chart, and percentage were used to present the data. This study's findings rank experience criteria as the most important criteria which is also used to maximize time at the decision stage in case of ample time. It also shows the relative importance indices for each prequalification criteria, and financial criteria as the best practiced in Lagos state.

Keywords : Prequalification, Experience, Contractor, Time, Construction.

One of the most crucial choices a client can make for the progress of the project is the choice of a qualified contractor for a building project. Prequalification is a process to assess and evaluate a contractor's competence and skills to effectively finish a project if it is assigned to them. The purpose of this study is to evaluate a few prequalification processes in Lagos State. In this research project, survey research was used. A thorough study of the available literature was done, along with a well-designed questionnaire. A questionnaire that was sent to clients and contractors (Architects, Builders, Engineers and Quantity Surveyors) was used to gather the data. A statistical table, frequency chart, and percentage were used to present the data. This study's findings rank experience criteria as the most important criteria which is also used to maximize time at the decision stage in case of ample time. It also shows the relative importance indices for each prequalification criteria, and financial criteria as the best practiced in Lagos state.

Keywords : Prequalification, Experience, Contractor, Time, Construction.

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe