Authors :
Asep Rudiana Rachmat; Dewi Nusraningrum
Volume/Issue :
Volume 9 - 2024, Issue 2 - February
Google Scholar :
http://tinyurl.com/3art4dbz
Scribd :
http://tinyurl.com/y22ybavd
DOI :
https://doi.org/10.5281/zenodo.10714721
Abstract :
The water treatment unit is a unit tasked with
distributing clean water at Soekarno Hatta airport. In
carrying out the maintenance process this unit has not
implemented TPM (total productive maintenance) in its
entirety, even though implementing TPM is important
because it can improve the performance of centrifugal
pump equipment as the main driver. clean water at
Soekarno Hatta airport using the OEE and six big losses
calculation method. The implementation of green TPM
has not been running optimally, with many corrective
maintenance processes still causing quite long loading
times and breakdown times . This incident was caused by
the condition of spare parts not being properly recorded,
personal conditions that were still lacking in the
nomenclature of this unit. and the TPM pillars have not
been implemented to support the eco airport program
launched by the Company. The water treatment unit has
26 centrifugal type main distribution pumps which will be
used as research media. Data collection was carried out
by conducting direct checks in the field and conducting
group discussion forums (FGD) with the water treatment
unit technical team. From the results obtained through
calculating OEE and Six big losses on these 26 main
distribution pumps, the OEE value on the pumps was still
below the value of 85 % according to world standards. By
implementing TPM, it is hoped that the pump
maintenance process can be more optimal so that it can
reduce the value of losses on the main distribution pump
and can increase the OEE value on the pump.
Keywords :
Total Productive Maintenance, Six Big Losses, OEE.
The water treatment unit is a unit tasked with
distributing clean water at Soekarno Hatta airport. In
carrying out the maintenance process this unit has not
implemented TPM (total productive maintenance) in its
entirety, even though implementing TPM is important
because it can improve the performance of centrifugal
pump equipment as the main driver. clean water at
Soekarno Hatta airport using the OEE and six big losses
calculation method. The implementation of green TPM
has not been running optimally, with many corrective
maintenance processes still causing quite long loading
times and breakdown times . This incident was caused by
the condition of spare parts not being properly recorded,
personal conditions that were still lacking in the
nomenclature of this unit. and the TPM pillars have not
been implemented to support the eco airport program
launched by the Company. The water treatment unit has
26 centrifugal type main distribution pumps which will be
used as research media. Data collection was carried out
by conducting direct checks in the field and conducting
group discussion forums (FGD) with the water treatment
unit technical team. From the results obtained through
calculating OEE and Six big losses on these 26 main
distribution pumps, the OEE value on the pumps was still
below the value of 85 % according to world standards. By
implementing TPM, it is hoped that the pump
maintenance process can be more optimal so that it can
reduce the value of losses on the main distribution pump
and can increase the OEE value on the pump.
Keywords :
Total Productive Maintenance, Six Big Losses, OEE.