Analysis of Machine Design Project Scheduling Ncb 8 Critical Path Method (Cpm) Load and Method of Manufacturing Oriented Control (Lomc) in Pt. XXX


Authors : Rezti Miranty Syahrully, Octoberry Julyanto, Edna Maryani, Donny Sanjaya

Volume/Issue : Volume 5 - 2020, Issue 1 - January

Google Scholar : https://goo.gl/DF9R4u

Scribd : https://bit.ly/38lLsTu

Accuracy in order fulfillment time of the company's promise and product quality are in line with expectations, as well as the fees charged are considered reasonable is unsur-satisfaction elements that must be met by the company to the consumer. PT. XXX is a manufacturing company engaged in the manufacture of products such as car parts car roof, hood and fenders. Based on data from the company, according to the company in 2018 many mismatches or delayed against the schedule or machines that have been made. The purpose of this study to determine the time of receipt to the method Expenses Oriented Manufacturing Control (LOMC) in which the time of receipt of the order is based on a calculation that takes into account the lead time delivery time manufacturing orders for customers, available capacity at each work station, the processing time at the work station and the flow of production on the production floor and also determine the critical path on the activities to be undertaken by the NCB 8 engine. By using the Load method Oriented Manufacturing Control by observing the available capacity, delivery times and priority sequence obtained in the acceptance of the project and also made a critical path analysis of the project to be undertaken by the NCB 8 engines like PL, BJN, BJ, BN, bY. and K2. This shows that the calculation time of order entry order using expense method Oriented Manufacturing Control (LOMC) is more accurate than the actual method. delivery times and priority sequence obtained in the acceptance of the project and also made a critical path analysis of the project to be undertaken by the NCB 8 engines like PL, BJN, BJ, BN, BY. and K2. This shows that the calculation time of order entry order using expense method Oriented Manufacturing Control (LOMC) is more accurate than the actual method. delivery times and priority sequence obtained in the acceptance of the project and also made a critical path analysis of the project to be undertaken by the NCB 8 engines like PL, BJN, BJ, BN, BY. and K2. This shows that the calculation time of order entry order using expense method Oriented Manufacturing Control (LOMC) is more accurate than the actual method.

Keywords : Critical Path, Project, Date Reachive.

CALL FOR PAPERS


Paper Submission Last Date
31 - March - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe