Analysis of Flood Control in the Area of Development II City of Pekanbaru (Case Study: In Bukit Raya Sub-District, Pekanbaru)


Authors : Syafriadiman, Kirno.

Volume/Issue : Volume 4 - 2019, Issue 6 - June

Google Scholar : https://goo.gl/DF9R4u

Scribd : https://bit.ly/2JgSU84

Flooding is a major problem that occurs during the rainy season. Planning for the development of retention ponds in Bukit Raya sub-district can be an ecodrain-based flood control effort. The purpose of this study was to analyze the capacity of retention ponds as flood control buildings in the study sites. Determination of 5-year periodic retention analysis in this study is to use Log Person III probability distribution. Then, to analyze the flood flows in this study is to use the EPA SWMM program. The results of the analysis show that the floods occurring at the study sites are caused by the limited drainage capacity and the flow of water flowing into the lowest contour channel. Changes in drainage structures and supporting constructions can overcome flood problems in the study sites. The retention pool capacity is 12,000 m3 with a maximum depth of 1 m and ponded area of 12,000 m2.

Keywords : Flood Control, Drainage, Retention Pond.

CALL FOR PAPERS


Paper Submission Last Date
30 - April - 2024

Paper Review Notification
In 1-2 Days

Paper Publishing
In 2-3 Days

Video Explanation for Published paper

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe