Abstract :
This study analyzes the influence of contractor performance on user satisfaction in road and bridge construction
projects in North Morowali Regency. Data collection used a questionnaire within the Public Works, Spatial Planning,
Housing, and Regional Settlement Areas Office of North Morowali Regency. Data analysis employed two methods:
Structural Equation Modeling based on Partial Least Squares (SEM-PLS) and Relative Importance Index (RII). The
SEM-PLS analysis results show that contractor performance has a very strong contribution to user satisfaction, with an RSquare (R²) value of 0.789. This indicates that 78.9% of user satisfaction is influenced by contractor performance. Based
on the RII analysis, the Specifications and Material Testing Results indicator is the most dominant factor influencing
contractor performance, with an RII value of 0.709. For user satisfaction, three main indicators have a balanced RII value
(0.663): compliance with the work plan and budget; contractor understanding of owner needs; and proactive and solutionoriented capabilities when addressing field problems. Equipment suitability is the lowest contractor performance
indicator, with an RII value of 0.589. Therefore, strategies to improve performance are needed, such as strict periodic
maintenance, having spare parts available on-site, using officially licensed operators, and completing daily equipment
check sheets.
Keywords :
Contractor Performance, User Satisfaction, Roads and Bridges, SEM-PLS, RII.
References :
- R. Dinata dan R. D. Kusdian, “Kajian Kompetensi Tenaga Ahli Supervisi Terhadap Keberhasiln Proyek Konstruksi Jalan dan Jembatan di Jawa Barat,” Inov. Pembang. J. Kelitbangan, vol. 14, no. 1, 2026.
- M. Syahroni dan Siswoyo, “Analisis Kepuasan Owner Terhadap Kinerja Kontraktor di Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Lumajang,” Rekayasa dan Manaj. Konstr., vol. 6, no. 3, hal. 165–170, 2018.
- M. I. Maromi, “Metode earned value untuk analisa kinerja biaya dan waktu pelaksanaan pada proyek pembangunan Condotel De Vasa Surabaya,” J. Tek. ITS, 2015.
- R. Maulana, Analisis Kepuasan Pelanggan terhadap Kinerja Manajemen Proyek pada Kontraktor Bangunan Gedung Berkualifikasi Kecil di Yogyakarta. Yogyakarta: Tesis Magister Teknik Sipil Universitas Islam Indonesia, 2020.
- D. Fitriana, F. Y.K.O., J. Utomo, dan T. D.S, “Pengukuran Kepuasan Kontraktor Terhadap Kinerja Klien Pada Proyek Konstruksi Swasta,” Karya Tek. Sipil, vol. 3, no. 1, hal. 283–295, 2014.
- Y. M. Lyanawati, L. Mulyadi, dan L. K. Wulandari, “Analisa Kinerja Kontraktor Terhadap Kualitas Proyek Peningkatan Jalan di Kabupaten Probolinggo,” INFOMANPRO, vol. 11, no. 2, hal. 58–69, 2022.
- D. Kurnia, “Analisis Tingkat Kepuasan User Terhadap Kinerja Kontraktor (Studi Kasus Perawatan Gedung Perkantoran Polda Jabar,” Sist. Infrastruktur Tek. Sipil (SIMTEKS, vol. 3, no. 2, hal. 200–213, 2023.
- D. Kurniawan, “Faktor-Faktor Kritis Penentu Kepuasan Pelanggan Terhadap Proyek Kontraktor Bangunan Gedung di Kota Bukittinggi,” Tesis Pascasarjana Universitas Bung Hatta, Padang, 2015.
- B. Bungin, Metodologi Penelitian Kualitatif. Jakarta: PT Rajagrafindo, 2010.
- Sugiyono, Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung: PT Alfabeta, 2009.
- B. P. Rao, S. C. Shekar, N. Jaiswal, A. Jain, dan A. D. Saxena, “Delay analysis of construction projects,” J. IT Econ. Dev., vol. 7, no. 1, hal. 15–24, 2016.
- A. Shrivas dan H. K. Singla, “Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach,” Int. J. Constr. Manag., vol. 22, no. 8, hal. 1455–1463, 2022.
- A. R. Saputra, Pengaruh Kompensasi Dan Komitmen Organisasional Terhadap Kinerja Karyawan Dimediasi Motivasi Kerja. Studi Kasus Di Hotel Merah Group Magetan, Jawa Timur, Indonesia. Universitas Islam Indonesia, 2018.
- N. Mardiana dan A. Faqih, “Model Sem-Pls Terbaik Untuk Evaluasi Pembelajaran Matematika Diskrit Dengan Lms,” Ilmu Mat. Dan Terap., vol. 13, 2019.
This study analyzes the influence of contractor performance on user satisfaction in road and bridge construction
projects in North Morowali Regency. Data collection used a questionnaire within the Public Works, Spatial Planning,
Housing, and Regional Settlement Areas Office of North Morowali Regency. Data analysis employed two methods:
Structural Equation Modeling based on Partial Least Squares (SEM-PLS) and Relative Importance Index (RII). The
SEM-PLS analysis results show that contractor performance has a very strong contribution to user satisfaction, with an RSquare (R²) value of 0.789. This indicates that 78.9% of user satisfaction is influenced by contractor performance. Based
on the RII analysis, the Specifications and Material Testing Results indicator is the most dominant factor influencing
contractor performance, with an RII value of 0.709. For user satisfaction, three main indicators have a balanced RII value
(0.663): compliance with the work plan and budget; contractor understanding of owner needs; and proactive and solutionoriented capabilities when addressing field problems. Equipment suitability is the lowest contractor performance
indicator, with an RII value of 0.589. Therefore, strategies to improve performance are needed, such as strict periodic
maintenance, having spare parts available on-site, using officially licensed operators, and completing daily equipment
check sheets.
Keywords :
Contractor Performance, User Satisfaction, Roads and Bridges, SEM-PLS, RII.