Analysis in Machine Design Project Scheduling NCB 8 Using Critical Path Method (CPM) Load and Method of Manufacturing Oriented Control (LOMC) in Pt. XXX


Authors : Erry Rimawan; Rezti Miranty Syahrully; Dias Irawati Sukma; Hasiholan Manurung; Algi Fahri

Volume/Issue : Volume 5 - 2020, Issue 12 - December

Google Scholar : http://bitly.ws/9nMw

Scribd : https://bit.ly/38AYUFn

Abstract : Accuracy in order fulfillment time of receipt of the promised company and product quality are in line with expectations, as well as the fee charged is considered reasonable is unsur-satisfaction elements that must be met by the company to the consumer. PT. is a manufacturing company engaged in the manufacture of products such as car parts car roof, engine hood and fenders. Based on data from the company, according to the company in 2018 many mismatches or delayed against the schedule or the machine that has been made. This study aims to determine the time of receipt of the order to the Load method Oriented Manufacturing Control (LOMC) where the timing of the receipt of the order is based on a calculation that considers the manufacturing lead time order delivery time to customers, and also determine the critical path on the activities to be undertaken by the NCB engine 8. Using the Load method Oriented Manufacturing Control with due regard to the available capacity, delivery time and the priority order is obtained within project acceptance and also make critical path analysis of the project to be undertaken by the NCB 8 engines like PL, BJN, BJ, BN, bY. and K2.

Keywords : Critical Path, Project, Reachive Date

Accuracy in order fulfillment time of receipt of the promised company and product quality are in line with expectations, as well as the fee charged is considered reasonable is unsur-satisfaction elements that must be met by the company to the consumer. PT. is a manufacturing company engaged in the manufacture of products such as car parts car roof, engine hood and fenders. Based on data from the company, according to the company in 2018 many mismatches or delayed against the schedule or the machine that has been made. This study aims to determine the time of receipt of the order to the Load method Oriented Manufacturing Control (LOMC) where the timing of the receipt of the order is based on a calculation that considers the manufacturing lead time order delivery time to customers, and also determine the critical path on the activities to be undertaken by the NCB engine 8. Using the Load method Oriented Manufacturing Control with due regard to the available capacity, delivery time and the priority order is obtained within project acceptance and also make critical path analysis of the project to be undertaken by the NCB 8 engines like PL, BJN, BJ, BN, bY. and K2.

Keywords : Critical Path, Project, Reachive Date

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe