Abstract :
Accuracy in order fulfillment time of receipt of
the promised company and product quality are in line with
expectations, as well as the fee charged is considered
reasonable is unsur-satisfaction elements that must be met
by the company to the consumer. PT. is a
manufacturing company engaged in the manufacture of
products such as car parts car roof, engine hood and
fenders. Based on data from the company, according to the
company in 2018 many mismatches or delayed against the
schedule or the machine that has been made. This study
aims to determine the time of receipt of the order to the
Load method Oriented Manufacturing Control (LOMC)
where the timing of the receipt of the order is based on a
calculation that considers the manufacturing lead time
order delivery time to customers, and also determine the
critical path on the activities to be undertaken by the NCB
engine 8. Using the Load method Oriented Manufacturing
Control with due regard to the available capacity, delivery
time and the priority order is obtained within project
acceptance and also make critical path analysis of the
project to be undertaken by the NCB 8 engines like PL,
BJN, BJ, BN, bY. and K2.
Keywords :
Critical Path, Project, Reachive Date
Accuracy in order fulfillment time of receipt of
the promised company and product quality are in line with
expectations, as well as the fee charged is considered
reasonable is unsur-satisfaction elements that must be met
by the company to the consumer. PT. is a
manufacturing company engaged in the manufacture of
products such as car parts car roof, engine hood and
fenders. Based on data from the company, according to the
company in 2018 many mismatches or delayed against the
schedule or the machine that has been made. This study
aims to determine the time of receipt of the order to the
Load method Oriented Manufacturing Control (LOMC)
where the timing of the receipt of the order is based on a
calculation that considers the manufacturing lead time
order delivery time to customers, and also determine the
critical path on the activities to be undertaken by the NCB
engine 8. Using the Load method Oriented Manufacturing
Control with due regard to the available capacity, delivery
time and the priority order is obtained within project
acceptance and also make critical path analysis of the
project to be undertaken by the NCB 8 engines like PL,
BJN, BJ, BN, bY. and K2.
Keywords :
Critical Path, Project, Reachive Date