Abstract :
This thesis aim to examine regarding layout
methods, efficiency, productivity and fishbone towards
efficiency cost in an effort to increasing the product
productivity on Development sample room department
at PT XYZ in which to sort of current problem
regarding extra costs which exceed the company's
target every monthly and The company's desire to
increasing the output result during period July 2018
until December 2018. This research has purpose to
discover the influence of an increasing efficiency cost
and increasing productivity through layout method,
efficiency, productivity and fishbone towards efficiency
cost and productivity on Development Sample Room at
PT XYZ. The research results shows there has an
increasing in efficiency cost around 27% which nominal
amounted Rp.13.200 / monthly therefore there has
decreed in actual cost with that amount aswell. The
influence of layout that transform the distance from
previously in 400.5 m into 143 metres so it makes the
production process faster and more efficient as for
productivity ,there has no increase in it because
basically the target or order has been received to be
completed that month
Keywords :
Layout, Efficiency, Productivity and Fishbone.
This thesis aim to examine regarding layout
methods, efficiency, productivity and fishbone towards
efficiency cost in an effort to increasing the product
productivity on Development sample room department
at PT XYZ in which to sort of current problem
regarding extra costs which exceed the company's
target every monthly and The company's desire to
increasing the output result during period July 2018
until December 2018. This research has purpose to
discover the influence of an increasing efficiency cost
and increasing productivity through layout method,
efficiency, productivity and fishbone towards efficiency
cost and productivity on Development Sample Room at
PT XYZ. The research results shows there has an
increasing in efficiency cost around 27% which nominal
amounted Rp.13.200 / monthly therefore there has
decreed in actual cost with that amount aswell. The
influence of layout that transform the distance from
previously in 400.5 m into 143 metres so it makes the
production process faster and more efficient as for
productivity ,there has no increase in it because
basically the target or order has been received to be
completed that month
Keywords :
Layout, Efficiency, Productivity and Fishbone.